Customization: | Available |
---|---|
After-sales Service: | Available |
Warranty: | Available |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Battery locomotive is used for underground transportation in mines.
Batteries are made of high-end aviation batteries, which are stable and durable. The locomotives are widely used in ferrous, non-ferrous, and non-metallic mines.
The improved battery locomotive has the advantage of a compact and solid body. The control assembly of the locomotive adopts a PWM pulse width modulator, which has over-current, under-voltage, short circuit, and multiple intelligent protection.
The pedal throttle installed in the cab can easily realize the operation control of soft start, uniform acceleration, uniform deceleration, and power-off braking, so that the running process of the electric locomotive is more stable.
Weight | 2.5T |
Rated DC voltage | 48V |
Dimension(L*W*H) | 2130mm*914mm*1450mm |
Max speed | 5.7km/h |
Speed | 4.54km/h |
Max traction | 8.7kN |
Traction | 2.55kN |
Battery capacty | 330Ah |
Speed adjustment mode | PWM control/potentiometer/foot accelerator |
Remote-control distance | 180m |
Track width | 600mm |
Wheelbase | 650mm |
Min Curve radius(m) | 5m |
Wheel diameter | 460mm |
Braking method | Mechanical Brake/Electric braking |
Power | 4kw*1 |
1. Are you a factory or trade company?
We are a manufacturer, we also supply trade service.
2. Will you provide some wearing parts of the machines?
Yes, of course. We ship them with the machine and spare parts in wooden boxes.
3. How is the quality of your products?
We have been approved by ISO and CE, and always produce our products strictly according to national and international standards. We do strict inspections in every production stage, and all the machines we sell are under warranty.
4. What about your price?
We always supply our products at a reasonable price to build long-term business and earn a good reputation.
5. What payments term do you accept?
We accept L/C, T/T, and other ways like D/A and D/P, etc, T/T goes with 30% advanced payment after signing the contract or order confirmation.
6. What about the order lead time?
We have two factories and big productivity, the order lead time is only 15-20 days.