Customization: | Available |
---|---|
After-sales Service: | Available |
Warranty: | 1 year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Capacity | Weight, empty | ||
Tramming capacity | 15000 kg | Operation weight | 16300 kg |
Dump box volume | 7.5 m3 | Front axle | 10100 kg |
Optional box | 8m3 (16000kg) | Rear axle | 6200 kg |
Main dimension | Weight, loaded | ||
Overall size | 7490X2150X2471 mm | Fully loaded weight | 31300 kg |
Box lift height | 4248 mm | Front axle | 15200 kg |
Wheelbase | 3626 mm | Rear axle | 16100 kg |
Min. ground clearance | 348 mm | Speed | |
Turning radius | 3500 / 6100 mm | 1st gear | 0~4.5 km/h |
Turning angle | 45° | 2nd gear | 0~9.8 km/h |
Dump angle | 60° | 3rd gear | 0~17.8 km/h |
Dump box motion time | 4th gear | 0~23.5 km/h | |
Discharging time | ≤13s | ||
Box lowering time | ≤10s | ||
POWER TRAIN | |||
Engine | Transmission | ||
Diesel engine | DEUTZ BF6M1013EC | Brand | DANA |
Output | 165kw @ 2300rpm | Model | RT32000 |
Max. torque | 854 Nm @ 1400rpm | Axle | |
Displacement | 7.2 L | Model | DANA 16D2149 |
Emission norms | EU II, US T2 | Type | Rigid planetary axle |
Converter | Tire | 14.00-24 L-5S TT | |
Brand | DANA | ||
Model | C273 or C313 |
1. Are you a factory or trade company?
We are manufacturer, we also supply trade service.
2. Will you provide some wearing parts of the machines?
Yes, of course. We ship them with the machine and spare parts in wooden boxes.
3. How is the quality of your products?
We have been approved by ISO and CE, and always produce our products strictly according to national and international standards. We do strict inspections in every production stage, and all the machines we sell are under warranty.
4. What about your price?
We always supply our products at a reasonable price to build long-term business and earn a good reputation.
5. What payments term do you accept?
We accept L/C, T/T, and other ways like D/A and D/P, etc, T/T goes with 30% advanced payment after signing the contract or order confirmation.
6. What about the order lead time?
We have two factories and big productivity, the order lead time is only 15-20 days.